The verification and certification phases of our double-door cabin on MR 1.5T were successfully concluded. AERA Siemens, built for Beltrami Costruzioni, which chose us over our competitors, after a technical/economic analysis, for the important supply at the FONDAZIONE “MAUGERI” in PAVIA. Collaboration with Beltrami now continues for the renovation of the MR 3T. GE already installed at the same institution.
Our work continues with objectives of increasing quality in all phases and maximum satisfaction of our customers.